CASE HISTORY 6


Howell, NJ • Spring 2010


For this project, a slide rail shoring system was utilized due to the extreme depth of the excavation and the proximity to the house.

The system was installed and removed using a PC 330 excavator to a depth of 20' below grade. This allowed for the removal of the contaminated soils without undermining the foundation.

The installation of the slide rail system and the excavation was completed in one day and the reduced cost of the project was passed on to the homeowner.

 